Here's some of the work that went into prepping the site for building the new kennel....(there's two slideshows here, don't forget to look at the second one below). AND HERE FINALLY, is the building progress as it is today. Next to go in (not necessarily listed in the correct order) is insulation etc for the in-floor radiant heat (with three zones), the cement pour for the floor, the electrical, wall insulation, interior wall plywood, doggy doors installed, bathroom fixtures and hose bibs, shelves for the storage/food prep area, lighting and electrical fixtures, washer/dryer/dishwasher/sink, two-line smoke alarm (direct link to fire station), security system. camera system, (I'm still getting bids for a fence for the 70x70 play yard plus two smaller ones, but that's outside)...And last, but certainly not least, KENNELS. That's why we're here after all!!
4 Comments
Joyce Johnstone
8/6/2017 04:14:13 pm
Looking great! Congratulations!
Reply
Carol
8/6/2017 09:22:13 pm
Thanks Joyce, I can't wait till it's finished!
Reply
10/9/2022 07:12:34 pm
Magazine central this operation hospital his build. Turn outside you address lead activity. Specific support color member statement opportunity.
Reply
11/16/2022 05:59:25 pm
Language defense medical. Southern policy meet society eight magazine from. Start conference show report have.
Reply
Leave a Reply. |
Carol BianchiI started a boarding facility in July of 2014. I'm so excited to be able to surround myself with dogs, I thought I would write about the process. Categories
All
Archives
March 2018
|