A lot has happened since my last update on the kennel building, but so slowly I decided to wait until it would be an informative update.
A "brief" summary of what's left (it's now a short enough list to actually list!): ADA pad to be poured and connected to the rest of the path, completion of septic drain-field hookup, propane hook up to heating and water system, concrete sealant, work area shelves 'n stuff, doggy safe sealant for the lower eight feet of plywood, plumbing installation, just a little more electrical, fences are supposed to go up this week, installation of the indoor/outdoor kennels when they get here, appliance delivery and installation, and the completion of the driveway. Then a quick walk through to catch anything missed before the final inspection. And on approval of that, OCCUPANCY!!
A "brief" summary of what's left (it's now a short enough list to actually list!): ADA pad to be poured and connected to the rest of the path, completion of septic drain-field hookup, propane hook up to heating and water system, concrete sealant, work area shelves 'n stuff, doggy safe sealant for the lower eight feet of plywood, plumbing installation, just a little more electrical, fences are supposed to go up this week, installation of the indoor/outdoor kennels when they get here, appliance delivery and installation, and the completion of the driveway. Then a quick walk through to catch anything missed before the final inspection. And on approval of that, OCCUPANCY!!
Pictures of the kennel building...
External work in progress: | Of all the projects in this next slide show, the water and dispersion system are the only things complete at this time. But, I think, maybe, this coming week will have a few more things completely completed. |
I think I'll cut this post off here and save some for the next update, in a day or two...probably.